Benoit
14th Mar 2008, 04:26 pm
I'm trying to make a parametric assembly by using a Excel file. I don't have difficulty to make my model.
Here's my problem. In my assembly I have a shaft that the diameter is variable. And that shaft is supported by a flange bearing that is already made in my own Contend Center. What I want to do is that my assembly inserts the right flange bearing depending of the Diameter of the shaft. Is it possible!
Thanks
Benoit
Here's my problem. In my assembly I have a shaft that the diameter is variable. And that shaft is supported by a flange bearing that is already made in my own Contend Center. What I want to do is that my assembly inserts the right flange bearing depending of the Diameter of the shaft. Is it possible!
Thanks
Benoit