therock005
18th May 2008, 08:04 pm
Introductory question
---------------------
The slope after the should and till the existing ground is the daylight slope right?
Y is it called like that?
The real question
-----------------
Anyway,in setting a basiccutfillslope i dont know the foreslope width cause every time is dynamic based on some criteria.How can i set the criteria which in my case are:
The lower part of the basic lane the (bottom of the width) extends till it reaches the daylight slope,and in that point of intersction the slope continues a vertical distance of .40m and that concludes the slope width.
I hope i made it compehensible enough.
---------------------
The slope after the should and till the existing ground is the daylight slope right?
Y is it called like that?
The real question
-----------------
Anyway,in setting a basiccutfillslope i dont know the foreslope width cause every time is dynamic based on some criteria.How can i set the criteria which in my case are:
The lower part of the basic lane the (bottom of the width) extends till it reaches the daylight slope,and in that point of intersction the slope continues a vertical distance of .40m and that concludes the slope width.
I hope i made it compehensible enough.