zoso190 Posted June 22, 2009 Share Posted June 22, 2009 I work in precast bridge design and I deal with a lot of tables that have multiple counts on them such as insets and rebar. A lot of time I have to adjust the layout and count of these items and then I have to go and readjust the counts on the table. a lot of these items are blocks so what I am wondering is if there is a way to link the block to the table so it will update the count automatically, that way it will save me some time and make things go smoother. Quote Link to comment Share on other sites More sharing options...
tzframpton Posted June 22, 2009 Share Posted June 22, 2009 Not with LT, no. If you had one of the Autodesk Vertical Products, you could tie in a Property Set Definition to a Schedule and it will update quantities on the fly. Quote Link to comment Share on other sites More sharing options...
zoso190 Posted June 22, 2009 Author Share Posted June 22, 2009 ok, well that sucks. i guess i am going to have to do it the old fashion way unless my boss gets an upgrade. thanks for your help. Quote Link to comment Share on other sites More sharing options...
BIGAL Posted June 25, 2009 Share Posted June 25, 2009 have a look at this http://www.cadtutor.net/forum/showthread.php?t=36212 Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.