    Default AutoCAD/database scheduling solution?

    Registered forum members do not see this ad.

    I have an idea for scheduling our plant’s production but I don’t know if it is possible. I would like have your input. We use AutoCAD 2011 and AutoCAD LT 2011. We also use Office 2010. I have some experience with Visual Basic.


    Here is the problem: We use Excel to schedule production of items in our plant. There are several workstations that produce several items each day. Presently, this activity is organized in a spreadsheet. This spreadsheet is manually updated maybe 2-3 times a day to reflect many variables that affect production. The data for this spreadsheet originates in the engineering department. This data is entered once in engineering for their use. Then again by the plant scheduler for his scheduling use. Then again by the plant scheduler to update our production database once the item is produced. I want to stop the insanity by entering the data once then using it many times as required.


    Concept of a solution: In AutoCAD, define a custom coordinate grid with days along the x-axis and the workstation numbers along the y-axis. Then, to represent each item to be produced, define blocks that would hold data from a linked Access database and production information (time/workstation, x /y from the AutoCAD file. When item data is updated in the database it would be reflected in the schedule. When the production data and location is changed in the AutoCAD it would be seen in the database.


    The scheduler could reposition the blocks in the AutoCAD file as needed to change the schedule.


    I really have no idea if this is possible. The idea came to me during my commute home one day last week. Thanks in advance for your comments.

  2. #2
    Senior Member
    Using
    AutoCAD 2014
    Join Date
    Sep 2010
    Location
    New Zealand
    Posts
    212

    Default

    Registered forum members do not see this ad.

    It would be better to use Autocad to populate the Excel Spreadsheet using VB or Visual Lisp and using Excel as the thing to distribute the information. This allows everybody using Autocad to do this BUT the Autocad LT users would not because VB and Visual Lisp is only for FULL autocad.

    Also everybody understands Excel (you can get anybody to write code for it or do charts).

    Hope this helps

Similar Threads

  1. Question about scheduling
    By blackeagle1245 in forum MEP
    Replies: 11
    Last Post: 6th Dec 2011, 04:17 pm
  2. Scheduling your work
    By SuperCAD in forum CAD Management
    Replies: 18
    Last Post: 28th Oct 2010, 09:05 pm
  3. Scheduling pressure drop
    By sakinen in forum Revit General
    Replies: 3
    Last Post: 5th Nov 2009, 03:37 pm
  4. AutoCAD Malicious Code / Virus Alert “acad.vlx” and Solution
    By Between the Lines in forum AutoCAD RSS Feeds
    Replies: 0
    Last Post: 8th Aug 2009, 02:20 am
  5. Help scheduling in ADT 2007?
    By caddude in forum AutoCAD Drawing Management & Output
    Replies: 6
    Last Post: 24th Aug 2007, 05:39 pm

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts