I'm all for accuracy in drawing but I've been taught that there is such a thing as being too accurate in labeling. It can lead to delays in construction if it is called out on the drawing and the fitters take too much time trying to be so accurate.
I don't understand why the tag won't pick up the elevation shown in the properties. Have you tried the formula for getting the elevation at the midpoint of the pipe and applying it to the fitting tag?




Reply With Quote
Bookmarks