I have a global question for excell Gurus , somebody have any IDEEA how is possible to optimize the lenght of rebar for a least waste ?

In my country the standard lenght is 12 meters

For Example I have : 3 position Ø 16 lenght 4 m , 3 position Ø 16 lenght 5 m , 3 position Ø 16 lenght 3 m

the best way it will be to cut from 12 meters 5+4+3

But somebody at building site can cut onother way , which will be uneconomic.

I attach a workbook.

is impossible every time create from bombinations 12 meters lenght but is important to get less waste.

I posted this question also on excel forum , may here is other Ideas

I don't to ofend other guys but I think here are the better mind ;)

Experiment.xlsx

Experiment.dwg

Link to comment
Share on other sites

Fuzzy logic comes to mind

 

If you draw all the bars and shuffle adding them up and down adding them together until they fit in a 12m length how many times up and down ?

 

There is software out there that does stuff like this fitting shapes into a rectangle similar approach. Keep repeat till leftover is minimal.

Link to comment
Share on other sites

I'm probably reading things wrong but:

 

Is there a coordination break - between drawing and spreadsheet - based on bar position and bar length? The break seems to start somewhere between position 35 (35 or lower all correct) and position 38 (here or higher, doesn't match between files).

Link to comment
Share on other sites

Yes the documents are different, I attach them ,may be somebody have a idea with lisp , may be somebody with macro excel ...

it doesn't matter in which program it will be done , important ,it should working

Link to comment
Share on other sites

If you want to use Excel to solve this optimization problem you can use the Solver feature.

 

Here I have set up your worksheet to show how to handle the problem for the 3 bar lengths of 25 DIA. The first step is to determine possible ways that the 3 lengths can be obtained from a single 12000 length bar and the amount of waste. Cases A - F show 6 ways and the amount of waste for each. I started with an initial guess of 10 units for each of the 5 cases. The table calculates the waste per bar in column L. Column P shows the total waste (waster per bar times number of bars used). Cell P73 also adds the waste as a result of any extra bars produced beyond what is needed.

Capture1.JPG

 

You then set up the conditions using Solver.

Capture2.JPG

 

The objective of the task is to minimize the waste so the Objective cell is the total waste, cell P73. The number of each case used is defined in cells F65:F70, with the constraints as noted specifying that the number of each size must be greater than or equal to the number needed.

 

Clicking Solve yields the following.

Capture3.JPG

 

Here's a link for the Excel file with my edits: https://dl.dropboxusercontent.com/u/18135203/Experiment-lrm.xlsx

 

What version of Excel are you using? ~ lrm

Link to comment
Share on other sites

Irm,

 

This is certainly a correct solution to the problem at hand.

 

However, using Excel solver you have to setup the patterns

of cut manually before proceeding.

 

As the number of required length increases the number of

possible patterns out of a bar grows exponentially and

make the method impractical.

 

ymg

Link to comment
Share on other sites

I am using 2010 version .

Here is one advice : I need to make a guess for an answer as a start.If your guess is wrong then you make another guess, until/if you can come up with a formula.

Click the button and watch it guess your answer 20 times. It will copy to the range on the right the best guess.

I make little changes in macro and it works but , but does not work for more rebars

If some one have some Ideeas how it possible to make it universal , it will be supper !

Experiment 2.zip

Link to comment
Share on other sites

Solver uses guesses to find a solution. You can automate the process of generating the possible cases for needed possible bar lengths. I am traveling so don't have time for a detailed answer. Good luck.

Link to comment
Share on other sites

  • 3 weeks later...

Hi ymg3 !!!

Sorry but I can't undestand how it works ?

I saw a lisp file, I put it in mine attached file , I can not understand the meaning of the results?

Link to comment
Share on other sites

Hello all,

Interesting topic.

A simple question: is this algorithm counting for splices ? The more splices you create the more extra material you add.

Thanks.

Link to comment
Share on other sites

tazzzz,

 

Afraid not, what it does is to minimize the amount of waste

when cutting the bars.

 

It does also attempt to minimize the number of patterns

utilized to reach a minimum of waste.

 

ymg

Link to comment
Share on other sites

Ymg , the third problem is what a need ,I understood it , I change some values manualy and it work realy fine, now the big problem is how to introduce them automaticaly in lisp file,it gona take a long way to do it manualy , first I need to export and sort them in excell after that to copy them to lisp file .

One more iDea it will be cool if every problem will reprezent a diameter for example: Problem 1 :∅10; Problem 2 :∅12; Problem 3 :∅14;... ∅16;∅18;∅20;∅22;∅25;

∅28; Problem 10 :∅32;

Link to comment
Share on other sites

sergiu,

 

As it is the program is only a proof of concept.

 

It would need work on the I/O so that we can enter a file

and subdivide it on the size of the bar.

 

Then the output could be an autocad table or a

graphical view.

 

I don't know where is your original data.

If it is in excel or in a csv or txt file, would be simple

to import it.

 

Post a real sample of your list and then I'll see.

 

ymg

Link to comment
Share on other sites

The main data is in autocad; There are blocks with attributes , I export them in Excel and already there I make the specification.

File with data is atached in first page "experiment"

Sorry I sort them inversely (mean the lenght) ...

Experiment.xlsx

Edited by sergiu_ciuhnenco
Link to comment
Share on other sites

sergiu,

 

Here I've modified the lisp so it will read

your file if you save it as csv.

 

Don't want to mess with direct from excel

as there are too many versions.

 

The Output is still crude and to the text screen.

 

To Run issue the command "SERGIU"

 

ymg

1DCSP.LSP

Experiment.csv

Link to comment
Share on other sites

Command " sergiu " : funny !!!

"The Output is still crude , in to the text screen" That's right , it gonna be more useful in table format, but is enough for you , you really work to much !!!

Phanks a lot , you help the economy of Moldova and not only Moldova I think !!! :D

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...