Jump to content

Penn Foster Civil Project, check PLATE 1


Hondatek

Recommended Posts

Ok Great remark. Iv'e started plate 2 Civil. Confused how you coming along? I also read ahead to the HVAC post about that later on new thread.

Link to comment
Share on other sites

  • Replies 31
  • Created
  • Last Reply

Top Posters In This Topic

  • Hondatek

    20

  • ConfusedStudent

    9

  • ReMark

    3

need some help did I miss something on plate 2? here are the instructions.

 

DRAWING THE DRIVEWAY

PROFILE AND SECTION A

PROFILE (PLATE 3)

A driveway (or roadway) profile and associated sections are

helpful when calculating the quantities of materials to add or

remove from the building site. Your driveway profile begins at

the center of the cul-de-sac on Ocean Avenue and runs the

entire length of the driveway’s centerline.

• For the driveway profile, use a vertical scale of 1″ = 10′

and a horizontal scale of 1″ = 60′. Show the stationing,

however, in 50-foot increments. Therefore, when plotting

the drawing, the distance between Station 0 + 00 and

Station 0 + 50 will be 5/6 of an inch.

1. Label Sta. 0 + 00 (Center of Cul-de-sac Ocean

Ave.), the curb, the ROW, the PC, the PT, and the

stationing at the end of driveway.

2. Use Layer Details with the appropriate hatch

patterns to show the cut and/or fill in the cross

section. Don’t forget to show the culvert as an

ellipse. You can make the culvert larger than it

actually is. This way, it’s easier to see on this

drawing. Indicate the culvert’s true diameter

next to the ellipse.

civil plate 3 check.jpg

civil plate 3 check-2.jpg

Link to comment
Share on other sites

ive read the thread from car5858 and remark. the detail i don't get where it comes from. i'm going to read plate 2 again.

Link to comment
Share on other sites

  • 2 months later...

Just finished the HVAC project. Got a 95. Working on the electrical now. Then just the elective to be finished.

Link to comment
Share on other sites

  • 2 weeks later...
  • 3 weeks later...

Just turned in the Electrical. Now to pick the elective and be done. I did pretty well on the Civil Project. I scored a 95.

Link to comment
Share on other sites

awesome. do electrical elective as your already rolling with electrical........ I got my diploma. still applying for jobs.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...