Relocation of loads presentation on demolition drawings


sam2001

Recommended Posts

I am working on a project where it involves relocating of some optional stand-by loads to the emergency side.

 

On the demolition electrical oneline drawings when the load is being demoed it is shown as dashed lines with mark up as demolished.

 

How is a load which is not being demoed but re-located or re-fed from a different source on demolition drawing.

 

Similarly how to show it on the floor plan as well.

 

Thanks in advance for any advice.

Link to comment
Share on other sites

Don't show it all on the same drawing as the demolition drawing. Instead, show "existing + demo" on one set of documents within the electrical set (Plan, 1-line diagram, details, etc), then show "remaining existing (after demo) + new/relocate" on a subsequent set of documents within the electrical set. Using different linetypes, lineweights, and/or screening to represent the demo/existing/new/relocated items respectively, based off your own company's standards.

 

This method breaks down the process much more clearly. It helps for the contractors to clearly bid the work, and it helps clearly define what's happening during each phase of the project.

 

Hope this helps. :)

 

-TZ

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...