raj banerjee Posted October 28, 2015 Share Posted October 28, 2015 (edited) Hello, im just starting to use revit and going through a few tutorials, I have modeled a steel frame with a roof, I am now adding some roof perlins, I am doing this by using a beam system with fixed spaced beams. My question is once I have drawn the beam system and the perlins are in place, is there a way for me to alter/modify the boundary (using edit boundary) and then once the green tick is selected the perlins within that system adjust to their new lengths if that makes any sense. Any help would be most appreciated. Edited October 28, 2015 by raj banerjee Quote Link to comment Share on other sites More sharing options...
tzframpton Posted October 28, 2015 Share Posted October 28, 2015 Hover over the beam system, and cycle through the system layout by using the Tab key. You should then be able to edit the boundary. See if this is what you're after. -TZ Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.