Jump to content
FIFTHTEXAS

How to Copy Families from One Project to an Other

Recommended Posts

FIFTHTEXAS

HI

can anyone tell me the best way to load a group of families from one project to another?

what is best procedure?

I have a plantroom with mechanical equipment all items I need to put into another project

how do I load families

 

thanks

Share this post


Link to post
Share on other sites
tzframpton

There's no way to do this in a batch form for Loadable Families. This is why most Revit users will keep a very organized directory structure on a network of all company-specific Family content. This is the central source that everyone works from. And if you create project specific Families, it's good practice to keep them updated in this location so you can easily load them into future projects.

Share this post


Link to post
Share on other sites
tzframpton

Actually, my first post wasn't entirely accurate. Certain things *can* be transferred in batch if you use the Transfer Project Standards tool under the Manage Tab. Things like... Pipe Fittings for all Pipe Types that are defined. Things to that nature.

Share this post


Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...