Hondatek Posted March 2, 2015 Author Share Posted March 2, 2015 Ok Great remark. Iv'e started plate 2 Civil. Confused how you coming along? I also read ahead to the HVAC post about that later on new thread. Quote Link to comment Share on other sites More sharing options...
Hondatek Posted March 9, 2015 Author Share Posted March 9, 2015 need some help did I miss something on plate 2? here are the instructions. DRAWING THE DRIVEWAY PROFILE AND SECTION A PROFILE (PLATE 3) A driveway (or roadway) profile and associated sections are helpful when calculating the quantities of materials to add or remove from the building site. Your driveway profile begins at the center of the cul-de-sac on Ocean Avenue and runs the entire length of the driveway’s centerline. • For the driveway profile, use a vertical scale of 1″ = 10′ and a horizontal scale of 1″ = 60′. Show the stationing, however, in 50-foot increments. Therefore, when plotting the drawing, the distance between Station 0 + 00 and Station 0 + 50 will be 5/6 of an inch. 1. Label Sta. 0 + 00 (Center of Cul-de-sac Ocean Ave.), the curb, the ROW, the PC, the PT, and the stationing at the end of driveway. 2. Use Layer Details with the appropriate hatch patterns to show the cut and/or fill in the cross section. Don’t forget to show the culvert as an ellipse. You can make the culvert larger than it actually is. This way, it’s easier to see on this drawing. Indicate the culvert’s true diameter next to the ellipse. Quote Link to comment Share on other sites More sharing options...
Hondatek Posted March 9, 2015 Author Share Posted March 9, 2015 ive read the thread from car5858 and remark. the detail i don't get where it comes from. i'm going to read plate 2 again. Quote Link to comment Share on other sites More sharing options...
ConfusedStudent Posted March 9, 2015 Share Posted March 9, 2015 Penn Foster Civil Drafting project plate 3 and 4 Civil drafting school project help Try looking at these threads. They may help. Quote Link to comment Share on other sites More sharing options...
Hondatek Posted June 9, 2015 Author Share Posted June 9, 2015 confused your turn now. come on we wanna see you finish too. Quote Link to comment Share on other sites More sharing options...
ConfusedStudent Posted June 10, 2015 Share Posted June 10, 2015 Just finished the HVAC project. Got a 95. Working on the electrical now. Then just the elective to be finished. Quote Link to comment Share on other sites More sharing options...
Hondatek Posted June 10, 2015 Author Share Posted June 10, 2015 do the electrical as your elective. you are on the electrical you can keep going. Quote Link to comment Share on other sites More sharing options...
Hondatek Posted June 10, 2015 Author Share Posted June 10, 2015 confused need help feel free to ask. Quote Link to comment Share on other sites More sharing options...
Hondatek Posted June 10, 2015 Author Share Posted June 10, 2015 Oh confused what grade you get on Civil? Quote Link to comment Share on other sites More sharing options...
Hondatek Posted June 19, 2015 Author Share Posted June 19, 2015 confused how you doing on projects? Quote Link to comment Share on other sites More sharing options...
ConfusedStudent Posted July 4, 2015 Share Posted July 4, 2015 Just turned in the Electrical. Now to pick the elective and be done. I did pretty well on the Civil Project. I scored a 95. Quote Link to comment Share on other sites More sharing options...
Hondatek Posted July 5, 2015 Author Share Posted July 5, 2015 awesome. do electrical elective as your already rolling with electrical........ I got my diploma. still applying for jobs. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.