Jump to content
Hondatek

Penn Foster Civil Project, check PLATE 1

Recommended Posts

Hondatek

Ok Great remark. Iv'e started plate 2 Civil. Confused how you coming along? I also read ahead to the HVAC post about that later on new thread.

Share this post


Link to post
Share on other sites
Hondatek

need some help did I miss something on plate 2? here are the instructions.

 

DRAWING THE DRIVEWAY

PROFILE AND SECTION A

PROFILE (PLATE 3)

A driveway (or roadway) profile and associated sections are

helpful when calculating the quantities of materials to add or

remove from the building site. Your driveway profile begins at

the center of the cul-de-sac on Ocean Avenue and runs the

entire length of the driveway’s centerline.

• For the driveway profile, use a vertical scale of 1″ = 10′

and a horizontal scale of 1″ = 60′. Show the stationing,

however, in 50-foot increments. Therefore, when plotting

the drawing, the distance between Station 0 + 00 and

Station 0 + 50 will be 5/6 of an inch.

1. Label Sta. 0 + 00 (Center of Cul-de-sac Ocean

Ave.), the curb, the ROW, the PC, the PT, and the

stationing at the end of driveway.

2. Use Layer Details with the appropriate hatch

patterns to show the cut and/or fill in the cross

section. Don’t forget to show the culvert as an

ellipse. You can make the culvert larger than it

actually is. This way, it’s easier to see on this

drawing. Indicate the culvert’s true diameter

next to the ellipse.

civil plate 3 check.jpg

civil plate 3 check-2.jpg

Share this post


Link to post
Share on other sites
Hondatek

ive read the thread from car5858 and remark. the detail i don't get where it comes from. i'm going to read plate 2 again.

Share this post


Link to post
Share on other sites
Hondatek

confused your turn now. come on we wanna see you finish too.

Share this post


Link to post
Share on other sites
ConfusedStudent

Just finished the HVAC project. Got a 95. Working on the electrical now. Then just the elective to be finished.

Share this post


Link to post
Share on other sites
Hondatek

do the electrical as your elective. you are on the electrical you can keep going.

Share this post


Link to post
Share on other sites
Hondatek

confused need help feel free to ask.

Share this post


Link to post
Share on other sites
Hondatek

Oh confused what grade you get on Civil?

Share this post


Link to post
Share on other sites
Hondatek

confused how you doing on projects?

Share this post


Link to post
Share on other sites
ConfusedStudent

Just turned in the Electrical. Now to pick the elective and be done. I did pretty well on the Civil Project. I scored a 95.

Share this post


Link to post
Share on other sites
Hondatek

awesome. do electrical elective as your already rolling with electrical........ I got my diploma. still applying for jobs.

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×