minivdub
11th Dec 2008, 09:29 am
hi there
my current job involves adding window and door schedules which i can do easily enough, when i place them into the drawing assuming i am in MEDIUM detail they will show up, if however i change to LOW detial the schedules dissapear. can anybody explain why and possibly how to correct this?
thanks
my current job involves adding window and door schedules which i can do easily enough, when i place them into the drawing assuming i am in MEDIUM detail they will show up, if however i change to LOW detial the schedules dissapear. can anybody explain why and possibly how to correct this?
thanks