brandonlukert
26th Aug 2009, 12:58 pm
I am trying to get ride of the dashed line that is in the weld symbol. I have never see that used before. I believe it is called the Identification line. Any suggestions?
Also I was wondering if any one has tried customizing the bom to meet there company's standards? Is it worth doing or should I stick with the traditional method of filling it in manually? I am trying ultimately have solidworks drive the complete project and these are some of the issues I am dealing with. This is a first for my company.
Also I was wondering if any one has tried customizing the bom to meet there company's standards? Is it worth doing or should I stick with the traditional method of filling it in manually? I am trying ultimately have solidworks drive the complete project and these are some of the issues I am dealing with. This is a first for my company.