I am setting up procedures for CAD in my office at the moment. I would like some help with a few things though. Would appreciate any thoughts.

 

**Rev**

If I start working on a drawing with say 5 tabs in it. As I work I issue the drawings but then one of them needs to be changed, reved up and re-issued. How do people name the file then. I had the idea that my original file would be say L2492-LA.dwg and the reved up one would be L2492-LA - Rev1.dwg. The problem is that only some of the drawings are at rev 1. I don't want to divide the layouts into separate drawings.

 

**Issued Drawings**

When people issue drawings do they generally use eTransmit to keep a dwg record of the file themselves or is it only a dwf/pdf copy that they keep themselves. We are having this discussion at the moment.

 

Thanks..

Posted

are your drawing a series or different??

 

i work in road design

so if i had more than one road marking drawing i would have each drawing on a tab so would save the drawing

 

RM/01-02-03

 

for road marking draws one to five

 

so if 2 was reved i would then have

 

RM/01-02A-03

Posted

Thanks for that but what do you do when you send out the first one without any rev. Do you just take a pdf copy or do you save out a full dwg with bound xref's??

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...