BIGMIKE09281946 Posted November 16, 2010 Posted November 16, 2010 (edited) According to the text in paper space on Layout 1 with four active viewports with the lower left port locked as the Base View. I am supposed to be able to create two construction lines so that I can align the other three images up to them, I am able to specify the first connection, but am unable to connect as I do in Model space. All I get is [specify through point:]... yatta yatta yatta. In another world I am also unable to dimension either. I am using AutoCAD 2009, not 2010. ACAD_2009_EXERCISE_CHAP_7.dwg Edited November 16, 2010 by BIGMIKE09281946 file attachment Quote
rkent Posted November 16, 2010 Posted November 16, 2010 Simply use an osnap like endpoint and pick an endpoint. Quote
BIGMIKE09281946 Posted November 16, 2010 Author Posted November 16, 2010 The problem has been resolved! Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.