sublettch
26th Mar 2011, 08:41 pm
Hello,
I am designing a RCC Dam and the shape of the dam is constant and will not change, but the dimensions of this shape are very likely to change depending upon hydraulic analysis.
I have written a program (irrelevant, but I am using MathCad 14) that performs a stability analysis of a RCC Dam (based on elevations from the hydraulic analysis) and then exports the dam dimensions and coordinates to Excel.
I am attempting to then take those coordinates (or dimensions) from Excel to create a 2-D dimensioned drawing of the Dam in AutoCAD.
I have successfully linked the Excel spreadsheet containing these coordinates and dimensions to AutoCad tables in my drawing, but I am having trouble getting AutoCAD to update my drawing as these tables update with different coordinates and dimensions.
I would like to have a drawing that is fully dimensioned (as the shape of the dam will not change), but that will update coordinates and dimensions as I pump out different dam dimensions from my stability analysis.
Hope this makes sense, let me know if anything is unclear.
Thanks!,
Sublett
I am designing a RCC Dam and the shape of the dam is constant and will not change, but the dimensions of this shape are very likely to change depending upon hydraulic analysis.
I have written a program (irrelevant, but I am using MathCad 14) that performs a stability analysis of a RCC Dam (based on elevations from the hydraulic analysis) and then exports the dam dimensions and coordinates to Excel.
I am attempting to then take those coordinates (or dimensions) from Excel to create a 2-D dimensioned drawing of the Dam in AutoCAD.
I have successfully linked the Excel spreadsheet containing these coordinates and dimensions to AutoCad tables in my drawing, but I am having trouble getting AutoCAD to update my drawing as these tables update with different coordinates and dimensions.
I would like to have a drawing that is fully dimensioned (as the shape of the dam will not change), but that will update coordinates and dimensions as I pump out different dam dimensions from my stability analysis.
Hope this makes sense, let me know if anything is unclear.
Thanks!,
Sublett