Jump to content

Recommended Posts

Posted

Hello

 

I was wondering if there is a tutorial on how to accomplish the following;

 

I work at a machine shop and have a Dynamic Block setup with quite a number of Blocks in it where I can choose whichever tooling I am working with to place into a drawing.

 

I am also Data-Linking parts of the drawing to Excel that has information fields to be updated in the drawing for these same toolings.

 

I would like to setup my drawing so that when I update the data links from the Excel spreadsheet the Dynamic Block I mentioned will also be automatically updated and display the appropriate block drawing for the tooling retrieved from Excel.

 

This would literally save me hours per month.

Is this possible?

 

Thanks and have a great day!

Posted

I moved your thread to a more appropriate location. While you wait for a response try checking out "Similar Threads" at the bottom of the page.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...