cadjunkee Posted August 7, 2011 Share Posted August 7, 2011 So here's my problem, im working on a highway design and have about 40 different assemblies that contain multiple lane sub-assemblies. The lane sub assemblies all have a pave 1 depth = .04 and pave 2 depth = .175 the contractor just asked us to change our pave 1 depth to = .05 and pave 2 depth to = .210 I've been going through every single sub assembly and changing each pavement depth individually and it's taking up wayyyy to much time. is there any way i can do some sort of multiple change or match pavement depths of one sub assembly to another? any help would be great thanks! Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.