Siberian Posted June 7, 2009 Posted June 7, 2009 I need the bottom of my pipe run to match with the top of another. What I do is to first set the vertical justification of my pipe to 'Bottom' and then use the Match command followed by Elevation. Only problem is that the bottom of my pipe is matched to the center of the second one instead of the top, creating a collision. Any way I can make that work? Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.