WeeralEenUsernaam Posted October 27, 2009 Posted October 27, 2009 Hello all, Got some electrical plans from a contractor (In E-plan). Need to combine these 5 plans into one. Now when i copy drawing numer one and paste it into my new drawing, everything fine. When i open the second drawing and copy it, something strange happens when i past it into my new drawing (where numer1 was pasted). Not everything is pasted and there is residue from the previous copy operation. Same happens when i open other drawings of the series. Does anyone have a explenation for this. It seems that the blocks used in the contractors drawings have always the same name. Can this be the problem?? Thanks in advance! Regards, Quote
rkmcswain Posted October 27, 2009 Posted October 27, 2009 Are these five separate drawing files? If so, have you tried using the ._INSERT command instead of copy/paste? Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.