-KarL- Posted February 8, 2012 Share Posted February 8, 2012 Anyone know how to select and tag conduit runs? I have been trying to find ways to get an overall length of conduit runs in a schedule table and finally figured out that if I use the 'Conduit without Fittings' families and create a 'Conduit Run' schedule, I can get those lengths. However I also want to assign a conduit number to each run and display it in the different views. I created a parameter and added it to the schedule, but I can not find a way to tag that number in the plan views and section views. Quote Link to comment Share on other sites More sharing options...
jadoidge Posted February 20, 2012 Share Posted February 20, 2012 Have you had any luck with assigning numbered tags? I'm trying to do a similar thing, numbering sewer stacks rising through a building. Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.