Jump to content

how do you make tranparent in autocad2007?


Recommended Posts

Posted

sir.

im familliar with autocad 2004, in this version my school had this topic on how to make tranparent material on windows. but when i used autocad 2007 its quite difficult for me coz on how to approach on materilas are diffirent in autocad 2004.

hope someone could help me.

 

 

thanks in advance.

 

arjun.

Posted

arjun_samar Welcome to the forum :)....here's some tutorials you can browse through...it will get you up to speed with the materials palette in aCAD 2007+

http://www.dailyautocad.com/render/

In the future please open your own threads to keep things more organized.

Cheers.

Posted

big bro Lazarus,

thanks... i'll try the site. hope to get some luck. :-)

im just new here..

Posted

hi big bro cad64.

nice to met u . :-)

Posted

bog bro cad64

sorry im just new here so i really dont know yet how this forum should work. :-)

Posted

gudpm jun! welcome to cadtutor forum. to set "transparent" in 2007, go to material set up. set the material transparency to 0. then apply the material to your 3d object. or you can use the glass clear under template "user defined"...

Posted

sorry what i was trying to make transparent material its in auto cad 2007 not in 2004.. chersss sory.. heheheh

Posted

ive tried the value of transparency to much higher value but sadly it doenst seem to work at all.

Posted

hi autocad_desinger08

where are you staying in Philippines?

kuya..... Kabayan.....heheheh

Posted

its applicable from 2004 to 2009... for transparency, the lower the value, the more transparent your material would become.... iligan city, lanao del norte, mindanao!:)

Posted
its applicable from 2004 to 2009... for transparency, the lower the value, the more transparent your material would become.... iligan city, lanao del norte, mindanao!:)

 

kuya autocad_designer,

 

taga mindanao po pala kayo....

ano po trabaho nyo? cad operator?:huh:

Posted

mechanical draftsman for Holcim project engineering... unfortunately, i just had my contract ended today. Holcim Lugait plant's process line 1 is on economic shutdown... then the last resort of the management is to remove all "costplus employees"(that includes me) and be replaced with those "regular employees" affected by the shutdown. im currently looking 4 a new job right nw! do u know one?

Posted
mechanical draftsman for Holcim project engineering... unfortunately, i just had my contract ended today. Holcim Lugait plant's process line 1 is on economic shutdown... then the last resort of the management is to remove all "costplus employees"(that includes me) and be replaced with those "regular employees" affected by the shutdown. im currently looking 4 a new job right nw! do u know one?

 

big bro...

sorry to hear that.... i really dont know a place where you can find job.... im just a student... im just on a on the job training here in a small contructor firm...

but if i can find a nice one for you, i'll let you know.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...