tcec2010 Posted April 17, 2011 Posted April 17, 2011 (edited) Hi guys, Anyone knows how to make the pipe stops at the outer/inner wall of the manhole on a longsection, as I will need to obtain/adjust the pipe inlet level on the manhole wall. Thanks. Edited April 18, 2011 by tcec2010 Quote
BIGAL Posted April 18, 2011 Posted April 18, 2011 We use preacast pits so worrying about the slight diff in levels is probably not worth it. the precast pits are made with the height diff between inlet and outlet correct. Having worked on field construction the string line method is normally a stake at the centre of pit similar for lasers, the pipe is laid and the pit slung into matching one pipe end then opposite pipe end is the start of next run. Quote