Jump to content

plan


Shom5

Recommended Posts

i did a few things in the plan

but i did't do the arch,S/U, furniture,and the main door

Concentrate on creating the entire floor plan (don't forget the windows). You can go back and add the doors and door swings afterwards.

Then you can move on to such things as the stairs at the front entrance, the kitchen and bathroom layouts (fixtures and cabinets).

Furniture comes last.

 

Are you being asked to dimension the drawing as well?

 

What about door and window schedules? Do you have to create these too?

Link to comment
Share on other sites

  • Replies 21
  • Created
  • Last Reply

Top Posters In This Topic

  • ReMark

    9

  • Shom5

    8

  • PotGuy

    4

  • eldon

    1

Top Posters In This Topic

Added 10 to all the dimensions. Why were you instructed to do that?

 

How much have you drawn so far. Post a screenshot.

 

The dashed lines represent the opening for the archway since there are no physical doors.

 

to make whole dimensions in mm i add 10 at the end of each dimensions.

 

p><p><img src=[/img]

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Unfortunately, your content contains terms that we do not allow. Please edit your content to remove the highlighted words below.
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...