  2. Interesting approach.I think verification against known dimensions is still necessary even after vectorization.
  3. Good point about using surrounding references to infer missing dimensions. Correcting parallax and distortion before tracing can make a significant difference, particularly with older scans. Reconstructing critical geometry from known dimensions still seems the safest option.
  4. Scaling in X and Y can correct some distortions, but it won't fix local warping across the sheet. For badly distorted scans, do you also check intermediate dimensions after scaling?
  5. Agreed. Redrawing from known dimensions is often the most reliable approach, especially when the scan itself is distorted. The challenge is when only a few dimensions are available and the rest of the geometry has to be reconstructed.
  6. When several engineers work on the same project, keeping track of design changes can become difficult, particularly when drawings are exchanged through email or shared folders rather than a centralized system. Comparing two DWG files may reveal geometric differences, but it doesn't always explain why a change was made or whether it affects connected components, dimensions, or downstream drawings. How do you manage drawing revisions in a multi-person CAD environment? Do you rely on revision clouds and revision tables, drawing comparison tools, file naming conventions, or a formal version-control system? What has worked reliably for your projects?
  7. Today
  8. Yesterday
  9. Spot on, BIGAL—that's a critical distinction between diagrammatic cadastral field sketches and true-scale engineering infrastructure models. You've hit on the classic COGO (Coordinate Geometry) dilemma: Australian field notes and title plans are drafted for A3/A4 paper-space readability, where a 1 km tie to a State Survey Mark (PSM) or recovery rivet is visually condensed or broken with a dimension annotation, rather than drawn at 1:1 ground distance. If you just take raw polyline vertices from those sketches, the geometry is obviously distorted. Our pipeline currently targets 1:1 ModelSpace engineering drawings—like civil water networks, road corridors, and solar EPC layouts where 1 CAD unit = 1 meter (or 1 foot) in real space, and surveyors shoot 3+ GCPs at boundaries/manholes to compute a rigid Helmert 7-parameter or affine transformation into MGA2020 / GDA2020. For diagrammatic field notes, automated OCR/COGO parsing of bearing-and-distance text is an active research challenge. In your day-to-day workflow, do you manually traverse and key in the bearings/distances in BricsCAD, or do you use a specific LISP/Civil routine to reconstruct the boundary?
  10. "surveyor's GCP tie-points to snap the CAD geometry to real-world ground truth" Here in Australia a lot has a Field notes plan submitted as part of lot registration, tying to known PSM's, Rivets, Nails etc But the plan is hand drawn you can have a plan that shows details at say a few metres and has a tie to a point a Km away all in the one plan so there is no true scale to the plan. They are drawn and have to be printable so no points a Km away. You would have to redraw it at true scale.
  11. @AONE_LED seems to be dredging all posts about lighting. Maybe put all his responses in one post, with a link and an answer, under the heading Lighting appliances and CAD. Maybe its @indiancad brother.
  12. You are 100% right @BIGAL and @SLW210. An unreferenced CAD drawing cannot replace SUE Quality Level A potholing/survey. Our tool is designed to ingest the surveyor's GCP tie-points to snap the CAD geometry to real-world ground truth
  13. I am pretty positive you are correct.
  14. Steven P

    Automatically drawing blocks

    Where I see posts dug up from many years ago - particularly if there are several answers years later from the same accout - I am starting to assume there is some 'computer aided searching' going on.. not saying a AI bot explicitly but.....
  15. Your YouTube video wasn't very helpful. This also looks to be a paid service you are advertising. I wouldn't work off of old drawings in those cases, like @BIGAL, I would get a field survey.
  16. Yes, they look to be selling a service to me.
  17. We have sent old blueprints and microfiche out to a company to be put to digital at a previous company, they did a pretty good job, no telling the cost, this was quite a while ago. My boss did ask a few years ago about getting some paid interns to do some old blueprints that need scanned. Yes, if your company wants to spend the money, there are some pretty good software choices out there to make it easier. After a short learning curve I did very well with Raster Design and a few LISPs. I plan to see if my work will get this... HP AI Vectorization | HP® Official Site | HP® Official Site, at least see about a trial.
  18. Yes, they have already been warned twice about this.
  19. EnM4st3r

    Automatically drawing blocks

    @AONE_LED you do realize those are decade old posts you are answering to?
  20. Try CAD Forum, CADblocksfree, or Zumtobel’s CAD library for fluorescent light fixture DWG blocks. Check the manufacturer drawings for accurate 2-lamp and 4-lamp fixture dimensions, including side and end views.
  21. Standard recessed fluorescent symbols are easy to draw yourself and then turn into blocks. In plan, a 2-lamp 2x4 (typically 600x1200 mm or 2'-0" x 4'-0") is a rectangle of those exact dimensions with a single diagonal, or two short lines for the lamps; a 2x2 (600x600 mm) uses a square and one diagonal. Put them on a dedicated lighting layer, insertion point at the centre so they sit cleanly on a ceiling grid. For the end and side views you asked for, draw a shallow housing (about 100-150 mm high) with two or four lamp circles or rectangles inside, and a small junction-box or ballast housing at one end if you need it. Make one block per type (2-lamp and 4-lamp) with a type attribute so you can schedule them later. Draw everything at 1:1 in model space.
  22. AONE_LED

    Automatically drawing blocks

    Don't try to insert a marshalling box the instant an eighth luminaire is placed. Place and number all luminaires first, then run a LISP that: (1) lets you select a group, or automatically clusters fixtures into groups of eight; (2) inserts the network-box block at the group's centroid or at a point you pick on the control route; (3) draws a polyline from the box to each luminaire in the group; (4) writes luminaire number, box number and a running count to a CSV for your BOM. Keep the "maximum 8 lamps per box" as a parameter, not hard-coded, because some boxes take fewer. DALI itself allows up to 64 short addresses on one bus; the eight-lamp limit is a wiring/marshalling constraint, not a protocol limit. That split keeps the drawing step and the takeoff step reliable.
  23. AONE_LED

    Lisp routine for spacing blocks

    The half-wall offset you want is just centre-to-centre spacing divided by two. Measure the room length L and width W, then decide how many fixtures you need in each direction (Nx and Ny). Spacing in X is L/Nx and in Y is W/Ny. Place the first fixture at (L/Nx)/2, (W/Ny)/2 from the corner, then ARRAY it Nx columns by Ny rows with those same column and row distances. That automatically keeps every fixture a half-spacing off the walls. ARRAY is enough for rectangular rooms; a LISP only needs two corner points plus Nx and Ny, then the same maths. Check the fixture's maximum spacing-to-mounting-height ratio so the grid is not too wide for the ceiling height. For non-rectangular rooms, hatch or BOUNDARY the area first and insert only inside that outline.
  24. Last week
  25. Hire a casual, student, some one wanting experience drafting, raster to vector can be a hit or miss. Use Ortho a lot when tracing over, and like others read the dims, using ortho start point, drag then type dim value. A secret underlay is a pdf.
  26. Welcome aboard Tommy there are a few people here who can help you. My questions, where are you in the world ? What discipline are you in, helps to get people with similar skils. Sent you a PM.