  1. @Dadgad Actually I even went as far as creating a lisp command so I can make the selections to dwgunits within a dcl gui instead of looking at the dull command line interface. https://marketplace.autodesk.com/apps/5190d5ec-0b6a-4b70-b089-2753abcb8e3a?priceId=bfbb3227-aa55-4923-b9e6-7fe3db0a0a5b
    2 points
  2. When it comes to keeping copies of various revisions completed, file naming and renaming could become really tricky especially if they're externally referenced to other dwgs. So to avoid having to repath dwgs that may be referenced elsewhere, what I've done in the past is to have the most current dwg always named the same and stored in the same location. A folder is created with the revision date as the name and the dwg is then copied into that folder. Now I have preserved copies of major milestone revisions saved in the project folder.
    1 point
  3. This is something I hate to do, but sometimes I'm in a hurry. One title block may be different in some fundamental way. I can't just explode it, because I'll lose all the information in the attributes. There's not enough time to create an entire block for one sheet, and why bother when there's only one? So it's time to Burst a move (sorry).
    1 point
  4. Likewise, we save a full copy of the as issued drawings, plus the PDF mark ups and check prints each in a separate folder. Unless specified otherwise all our files are suffixed with the revision code. Mark ups and check prints are in sequentially numbered and dated folders - so we can always go back. Typical folders: 1.0 Working Drawings 2.0 Check Prints - 2.1 Check Print 01-01-26 - 2.2 Check Print 15-03-26 3.0 Markups - 3.1 Markup 01-01-26 - 3.2 Markup 10 -03-26 4.0 Previous Versions And of course if there is a significant change between issues, I'll save the before and after away somewhere safe We usually issue PDFs during the project and if required the as-builts as dwgs right at the end I believe that the construction cloud saves each save as a new version whether it is a new revision or not
    1 point
  5. Like others if a revision then a dwg was saved. We also saved a "AS Built" dwg, all our dwg's were recorded and could be looked up, we went back to 1999. They were saved as Tiffs later on as Pdf's. As we controlled the dwg's in regards to access by others, server locked, we made sure only the latest version was in the current working directory, we had a superseded directory. As part of document control a new project had specific directories premade.
    1 point
  6. This is one of the knottiest issues in engineering work. What constitutes a full revision? When do you issue a partial revision, if you do at all? How do you track the changes? How do you roll them back if necessary? Worst of all, different shops use different criteria, and sometimes the same shop uses different criteria for different projects. It seems like common sense, since storage is so cheap these days, to save a new copy of the drawing for each revision, and append the revision number to the file name. That way the old revisions are still available if you need to refer to them or send them to someone. Even better, keep the revisions in a subfolder so they don't clutter up the main project folder. And this should go without saying--keep current backups! The current working file should have the project name (or whatever) with no revision number. Again, though, some shops will use different standards. For smaller projects, there's no need to keep old revisions, especially if you've sent them out all along. You can go back to those emails for attached copies of old drawings. As always, simpler is better. Make a plan and stick to it. Otherwise you're asking for trouble.
    1 point
×
×